Machine

Biochar Kiln (Continuous Pyrolysis Unit)

A biochar kiln must do one thing above all – hold a repeatable temperature and residence time, because that is what makes repeatable carbon analysis possible. This page sets out how our continuous unit works, what input it needs and what the output looks like.

450-650 ℃ pyrolysis band15-40 min residence25-35% yield on dry feedRecovers its own process gasSuits soils, filtration and carbon projects

Quick answer – Biochar Kiln (Continuous Pyrolysis Unit)

The kiln pyrolyses dried biomass at 450-650 ℃ in an oxygen-starved chamber. Volatile gases are routed back to the burner, so once stable the unit largely heats itself.

Typical yield is 25-35% of dry feed mass at carbon content 70-85%. Higher temperatures raise fixed carbon but lower yield – the right setting depends on the specification you are selling against.

Biochar leaving the kiln is hot and dusty. Conditioning to 15-30% moisture is part of safe operation, not an optional extra.

450-650 ℃pyrolysis band
15-40 minresidence time
25-35%yield on dry feed
70-85%carbon content typical

How the machine works

Feedstock enters through a gas-tight hopper into a heated screw or retort, travels through the hot zone and discharges into a sealed cooling conveyor.

Oxygen exclusion is the design priority. Any air ingress burns your product and raises ash, so seals and discharge valves are specified accordingly.

Process gas is cleaned and burned, providing reactor heat and often surplus for drying – start-up still needs external fuel until the reactor stabilises.

Ask about this machine configured to your material

Send us your raw material, target output and the shape your market buys. We return the machine configuration and a landed budget.

    Technical specification

    Parameter Value
    Operating temperature 450-650 ℃
    Residence time 15-40 minutes, set by feed rate and reactor length
    Yield 25-35% of dry feedstock mass, industry-typical
    Carbon content of product 70-85% typical
    Feed moisture Below about 20% for stable autothermal running
    Feed size Below 10 mm after chipping and milling
    Machine overview
    Machine overview
    Working view
    Working view
    In the workshop
    In the workshop
    Product detail
    Product detail

    Models and sizing

    Model Output Power Suited to
    Entry Around 1 t/day biochar Low installed power class Farm and estate projects
    Standard 3-5 t/day biochar Medium Regional soil and filtration markets
    Industrial 8-10 t/day biochar High Carbon removal projects and export programmes
    All models Confirmed by test on your feedstock – –

    Output figures depend on your material, its moisture and the shift pattern. Final sizing is confirmed by a trial run on your own feedstock before quotation.

    Machine budget

    Configuration Equipment budget
    Entry kiln module USD 18,000 – 45,000
    Kiln with dryer, conditioning and screening USD 45,000 – 160,000
    Note Equipment only; landed cost adds shipping, duties, civil works and commissioning

    Applications

    • Soil amendment programmes and blended growing media
    • Filtration and adsorption media after further processing
    • Carbon removal projects requiring documented batch analysis

    What you get with the machine

    • Gas-tight feed and discharge for oxygen exclusion
    • Process gas recovery to the reactor burner
    • Adjustable residence time for different biochar grades
    • Sampling points built in so every batch can be traced
    • Downstream conditioning, screening and packing modules available

    Testing before buying. Send three to five kilograms of your material. We run it through the same machine class we are recommending and return the samples with the settings and the report.

    Request a quotation

    Tell us the material, moisture today and target tonnes per day – or simply the model you are looking at. We answer with specification, lead time and landed cost.

      Where this machine sits in a line

      Frequently asked questions

      What specifications do biochar buyers ask for?

      Commonly carbon content and H:Corg ratio, ash, pH, BET surface area and nutrients. Which ones are mandatory depends on the buyer’s own standard – agree that before you build.

      Do you provide certification?

      No. We supply the plant, sampling points and reporting templates. Certification is obtained by the project owner through an accredited laboratory, which protects its independence.

      Can the kiln handle mixed feedstock?

      Mechanically yes, but mixed input makes carbon figures move between batches. Most buyers want one declared feedstock with documented origin.

      Can it also make charcoal for fuel?

      Yes. Lower-temperature operation gives a higher yield of fuel charcoal from the same reactor.

      Is there emissions treatment?

      Process gas is burned in the reactor’s own burner. Final flue treatment requirements depend on your local permit and are specified per project.

      How long until it is running without external fuel?

      Once the reactor reaches steady state, normally within the first operating shift after warm-up.